Weekly update:
The Galileo parts came in, but the printer forgot to include the x-carriage, so I fiddled around with some smaller things this past week. Carriage should be here tomorrow (22 May). I’ll be very interested to see how much it actually varies from the original; ie, whether I could have easily modified the stock part to fit the Beacon.
So I built the Galileo, although, after watching a video, I can see the wiring is on the wrong side. Is the manual wrong?
The Steve Builds video shows the wiring on the other side (coming out under the cover), which makes sense.
Another G2 question- the kit comes with a collet for the filament, but the printed housing doesnt have a hole large enough to install it.
1 - can I manually bore the existing hole?
2 - barring that, do I just use the PTFE tube here?
Started putting together the SB, and the hotend (may have already mentioned the hotend).
Built the Clicky-Clack door mod - the kit from West3D is very nice and easy to put together.
I’ve avoided the wiring so far because I’m a little worried about confusing the shit out of myself - in between the manual, the SB manual, the G2 manual, the LDO build notes (which seem to have their own issues with page numbers) and whatever else (I haven’t even gotten to Nitehawk or Beacon yet!) - it seems very easy to lose track of things.
Still, I try to do some little thing every day, so for today:
- while the build is still in a somewhat minimal state, recheck frame squareness and belts in advance of X carriage arrival.
- flash / configure the Pi.
- rebuild G2 with wiring in correct position.